Updates to Home
Exterior:
New Electrical Line from House to Garage (Oct 2005)
Installed Dusk to Dawn Light on Garage (Nov 2005)
New Front Sidewalk and Landscaping (Aug 2005)
French Drains on the North Side of House (Oct 2003)
New Garage Electrical Wiring (Jan 2003)
New Garage Door Opener with Remotes (2001)
26 New Thermal Windows and 4 Steel Doors on House and Garage, New Door
Bells (2000)
Rebuilt Garage Patio and Brick Patio Under Arbor, Installed Pella Storm
Doors and Removable Screens (2000)
New Rubber Roof on East Side of House (Nov 1999)
Reappointed Chimney, Capped, Flu Liner Installed for Hot Water Heater
(1999)
Interior:
Remodeled Bathroom to Include New Vanity/Sink, Toilet, Beadboard Wainescotting,
and Granite Floor (Dec 2005)
Installed New Kitchen (including New Maple Cabinets, Solitex Hard Surface
Counter, Undermount Sink, Tin Backsplash, Ceramic Tile Floor, Above-Range
Microwave, and Dishwasher (Spring 2005)
Berber Wall to Wall Carpet and Padding on Second Floor and Stairwell
(2003)
Whole House Electric Box (200 AMP) and Surge Protection - 51120 PTC
(2003)
Sunroom Ceramic Floor (2001)
New Pressure Valve on Water Main (2000)
Sunroom Insulated with Anderson Thermal Doors and Windows, and Custom
Made Roman Shades (2000)
UGL Waterproofing of Basement Walls (1998-2000)
Electric Over (1999)
Trane XV90 Gas Forced Air Furnace with Honeywell Air Filter System,
Aprilaire Whole House Humidifier, Ductwork and Vents, and Central Air
Conditioning (Aug 1997)
|